What This Training Covers

Nursery Stages & Things to Know

The three stages โ€” seed planting, pre-nursery and main nursery โ€” plus the technique, care and operations for each.

1

Culling

Quality control: removing damaged or off-type palms at every checkpoint.

2

Transplanting

Moving selected seedlings from pre-nursery trays into larger main-nursery bags.

3

Sales & Collection

The site-office order flow, plus how seedlings are selected, loaded and handed over on site.

4
Section 1

The Three Nursery Stages

Every seedling moves through three stages in order. Each stage has its own location and routine.

Seed Planting

Germination

Germinated seeds are planted with the correct depth and orientation.

Pre-Nursery

3โ€“5 months

Young seedlings raised in trays with close daily care.

Main Nursery

7โ€“9 months

Transplanted to larger bags and grown until ready for sale.

Section 2 โ€ข Seed Planting

Planting Technique

When planting germinated seeds, two things must be correct every time: orientation and depth.

Telling Root from Shoot

Root โ€” longer Shoot
Radicle (root) โ€” the longer sprout
Both sprouts grow from the same spot and look alike โ€” the longer one is the root. When planting, point it DOWN into the soil.
Plumule (shoot) โ€” the shorter sprout
The shorter sprout becomes the leaves. Point it UP toward the surface.

Wrong orientation slows growth or kills the seed. Always check before covering.

Planting Depth

seed just covered soil surface
  • Plant at the recommended shallow depth โ€” just covered.
  • Too deep delays emergence; too shallow exposes the seed.
  • Firm the soil gently and water in after planting.
Section 3 โ€ข Pre-Nursery

Pre-Nursery Care Routine

Work to a monthly schedule โ€” check it every month, then carry out each task at its set rate.

Monthly Schedule

Reviewed every month. The schedule sets the plan for:

  • Watering schedule
  • Pest & disease spraying schedule
  • Weeding schedule
  • Manuring schedule
Watering
10 min
per watering session
Pest & Disease
Per schedule
spray as scheduled
Weeding
Once a month
remove weeds monthly
Manuring
5 g / seed
from the 2nd month old
Section 4 โ€ข Main Nursery

Main Nursery Operations

Five routine operations keep main-nursery seedlings healthy โ€” all guided by the monthly schedule.

Monthly Schedule

All rates and frequencies follow the monthly schedule โ€” reviewed and updated every month for:

  • Manuring / fertiliser schedule
  • Watering schedule
  • Pest & disease spraying schedule
  • Weeding schedule
  • Inter-row spray schedule
Manuring / Fertiliser
20 g
of fertiliser per seedling, every month
Watering
1.5 L
of water per seedling, every day
Pest & Disease
Per schedule
monitor and treat following the spray schedule
Weeding
2ร— / month
remove weeds from inside the polybags
Inter-Row Spray
2ร— / month
weed control sprayed between the rows
Section 5

Beyond the Routine: Quality & Movement

On top of daily operations, three activities control quality and move seedlings toward sale.

Culling

Removing damaged or off-type seedlings at several checkpoints so only healthy ones continue.

Transplanting

Moving selected seedlings from pre-nursery trays into larger main-nursery bags.

Collection of Seedling

Selecting, loading and handing over seedlings to the customer at the point of sale.

Section 5 โ€ข Culling

Culling at Every Stage

Seed-Damage Culling

During seed planting

Damaged or non-viable seeds are removed as we plant.

1st Culling

Month 3โ€“5 ยท before transplant

Picking is done before transplant. At the plot, workers only transplant.

2nd Culling

Month 4 ยท after transplant

Drone mapping identifies and counts dead palms in the main plot.

3rd Culling

At point of sale

Drone mapping is used again to count and cull when the plot is sold.

Section 5 โ€ข Transplanting

Transplanting to the Main Plot

1
Send soil to the empty plotSoil is delivered to the prepared empty plot.
2
Fill the polybagsPolybags are filled with the soil medium.
3
Line up the polybagsLined out at 3 ft ร— 3 ft spacing between polybags.
4
Transplant the seedlingsSelected seedlings are transplanted into the polybags.
5
Water twice dailyWatered 2ร— daily for the first 2 months until established.

From Pre-Nursery
to Main Nursery

Transplanted at month 3โ€“5

New transplants are watered twice daily for their first 2 months until they are well established.

Section 6 โ€ข Sales
Site Operation Personnel

Collection at Site

How site operation personnel run a collection once the customer arrives on site.

Step 1

Customer Arrives

Customer comes to the site for collection.

Step 2

Go to the Plot

We bring the customer to the plot to choose seedlings.

Step 3

Select with Sticker

Customer marks chosen seedlings using a sticker or seal.

Step 4

Worker Identifies

Our worker identifies the stickered / sealed seedlings.

Step 5

Load to Lorry

Selected seedlings are loaded onto the customer's lorry.

Step 6

Issue DO

On completion, our PIC issues the Delivery Order (DO).

Back to main page
Page 1

Congratulations!

You've finished the training slides โ€” next, your assessor will record your practical assessments to qualify you for your role.

Open Assessment Record Back to main page